Skip to content

Monitoring

Module 1, Supplier Group Monitoring Program: detect, verify, attribute, assess, act.

Detections held
96
alert · LAND_CONVERSION_ALERTS.length
In this edition
52
risk · ≥ 2 ha and confidence Medium or High
Awaiting a response
53
grie · case status Active or Open
Top 3 groups hold
44.1%
risk · top 3 group hectares ÷ total liable hectares
Product · backedAll products
01 · 01

The operating spine

Detect, Verify, Attribute, Assess, Act, counts inferred from fields we already hold

Five places where the work happens, and three things that run through all of them: Reporting is what leaves the product, Collaboration is what people add to it, Integration is what moves between it and the other modules.

  • Reporting · flow · part of Monitoring & Risk Intelligence
  • Collaboration · flow · current
  • Integration & API · flow · proposed

The funnel narrows hardest between Detect and Verify: 47 of 96 detections (49%) fall inside a mapped concession. The rest never resolve to anyone's land, and that is shown rather than smoothed.

02 · 02

Non-compliance dashboard

The operational register, read in decision order: Extremely High first, then the seven insight figures with their movement, then concentration, then the tracker

Extremely High, read this first
3

3 cases across 3 groups, 1,046 ha: a Stop Work Order was issued, an NDPE commitment is held, and clearing continued. That is not a risk score, it is a broken undertaking, and it is the category that changes a sourcing conversation.

Groups · Cahaya Borneo Group · Gading Kencana Group · Mahkota Sawit Group

  • Risk status · Extremely High, SWO issued AND NDPE commitment held AND still non-compliant
  • Risk status · High, case status is Active
  • Risk status · Medium, case status is Open
  • Risk status · Low, compliant up to the Recovery Plan stage
The seven insight figures

The operational register shows the level. The level tells an analyst where things stand; the change tells a director whether anything is working. No per-edition snapshot exists in the register, so the change since the previous edition is derived: a case counts as new this edition when hash(Case_ID) % 12 === 0. A stored edition table would replace this derivation.

Monitoring Scope
61 estates
= ±0 estates since ED-prev

distinct ID_Estate in the register

Non-Compliance Group
15
= ±0 since ED-prev

distinct Group among cases liable under the cut-off

GHG/DLUC
9,682,779 tCO2e
▲ +949,270 tCO2e since ED-prev

sum(Area x coefficient by land type)

Non-Compliance Area
23,971 ha
▲ +2,570 ha since ED-prev

sum(Area) of liable cases

NDPE
29
▲ +3 since ED-prev

cases whose group holds an NDPE commitment

SWO
11
▲ +1 since ED-prev

cases with a Stop Work Order issued

Recovery
15
▲ +1 since ED-prev

cases with recovery responsibility accepted

GHG/DLUC, coefficients and citations
Land typeCoefficientCitation
Forest500 tCO2e/ha · Mineral soil land-use changeRSPO PalmGHG Calculator, mineral soil carbon-stock change on forest conversion
Peat Forest, Peat55 tCO2e/ha · Drained peat, annualHergouarc'h & Verchot (2011), peat drainage emissions

Worked example · case GT-2023-0581, Peat Forest, 785 ha × 55 tCO2e/ha = 43,181 tCO2e.

Land type and cut-off regime are separate

NDPE liability covers Forest, Peat Forest and Peat. EUDR liability covers Forest and Peat Forest only. Switching the cut-off therefore changes both the year and the land types counted, peat clearing carries NDPE liability and no EUDR liability.

Land typeCasesHectaresNDPE liabilityEUDR liability
Forest3918,796Yes, all three land typesYes
Peat Forest135,174Yes, all three land typesYes
Peat00Yes, all three land typesNo, peat is excluded
Top 10 groups by non-compliance area

44.1% of the 23,971 ha in this cut-off sits with the top three groups. A handful of conversations covers most of the exposure.

#GroupCasesHectaresShare
01Sawit Lestari Group85,48622.9%
02Sinar Rimba Group62,73711.4%
03Nusantara Agri Group52,3389.8%
04Gading Kencana Group42,0028.3%
05Bumi Hijau Group41,7887.5%
06Selat Mas Group41,3825.8%
07Karya Palma Group31,3505.6%
08Cahaya Borneo Group31,3235.5%
09Puri Agro Group41,2665.3%
10Mahkota Sawit Group31,2555.2%
Tracker, ordered by the decision, not by the status
  • Active · Non-compliant during the reporting period. → Engage or suspend
  • Open · Not active when reported: no Stop Work Order, no liability, no recovery plan. → Chase for a recovery plan
  • Closed · Compliant up to the Recovery Plan stage. → Verify and move on
  • Dropped · Case dropped for a stated reason. → No action, reason recorded

In the guide a red entry marks a non-compliant supplier. Under our palette that red is the brand orange, and the line styles stay as they are.

CaseSupplier groupLand typeHaCase statusRisk statusSWORecovery planDecision
GT-2023-0581Puri Agro GroupPeat Forest785ActiveRisk status: High––Engage or suspend
GT-2025-0337Selat Mas GroupPeat Forest779ActiveRisk status: High––Engage or suspend
GT-2022-0295Panca Agro GroupForest729ActiveRisk status: High––Engage or suspend
GT-2021-0463Sinar Rimba GroupForest647ActiveRisk status: High––Engage or suspend
GT-2022-0092Bumi Hijau GroupForest530ActiveRisk status: High––Engage or suspend
GT-2021-0280Cahaya Borneo GroupForest461ActiveRisk status: Extremely HighIssued–Engage or suspend
GT-2023-0029Sawit Lestari GroupForest428ActiveRisk status: HighIssued–Engage or suspend
GT-2022-0400Gading Kencana GroupForest379ActiveRisk status: Extremely HighIssued–Engage or suspend
GT-2025-0160Nusantara Agri GroupForest269ActiveRisk status: High––Engage or suspend
GT-2025-0176Mahkota Sawit GroupForest206ActiveRisk status: Extremely HighIssued–Engage or suspend
GT-2026-0540Puri Agro GroupForest77ActiveRisk status: High––Engage or suspend
GT-2024-0470Sinar Rimba GroupPeat Forest34ActiveRisk status: High––Engage or suspend
GT-2023-0043Sawit Lestari GroupForest888OpenRisk status: Medium––Chase for a recovery plan
GT-2022-0392Gading Kencana GroupForest790OpenRisk status: Medium––Chase for a recovery plan
GT-2023-0497Sinar Rimba GroupForest776OpenRisk status: Medium––Chase for a recovery plan
GT-2022-0119Nusantara Agri GroupForest775OpenRisk status: Medium––Chase for a recovery plan
GT-2021-0511Sinar Rimba GroupPeat Forest754OpenRisk status: Medium––Chase for a recovery plan
GT-2023-0434Bintang Palma GroupForest731OpenRisk status: Medium––Chase for a recovery plan
GT-2022-0161Karya Palma GroupForest667OpenRisk status: Medium––Chase for a recovery plan
GT-2024-0064Sawit Lestari GroupForest611OpenRisk status: Medium––Chase for a recovery plan
GT-2023-0148Karya Palma GroupForest578OpenRisk status: Medium––Chase for a recovery plan
GT-2025-0127Nusantara Agri GroupPeat Forest469OpenRisk status: Medium––Chase for a recovery plan
GT-2025-0041Sawit Lestari GroupForest463OpenRisk status: Medium––Chase for a recovery plan
GT-2024-0078Bumi Hijau GroupForest412OpenRisk status: Medium––Chase for a recovery plan
Map legend, the guide's own line convention
  • dotted · Group approach, attribution through corporate group affiliation
  • solid · Trace-to-plantation approach, attribution through a traced supply link
03 · 03

The five surfaces

One card each, in the brief's order, what is built and what is not, without clicking

Monitoring & Risk Intelligence

current

Detection and verification of land-cover change, conservation set-asides and fire, across the landscape.

  • Which supplier groups and which mills cleared what, on what evidence, and where.

  • M1 · 05HCV / HCS monitoringcurrent

    Which conservation set-asides are disturbed, by whom, when, and on what evidence.

  • GSM plots by type and evidence strength.

  • Land that burned and what happened next, with no claim about who lit it.

  • M1 · 06High-risk landscape identification & monitoringplanned

    Village and district risk classes with intervention focus.

  • Bi-weekly edition reportproposed

    Cases reported this edition, and what moved since the last one.

  • PDF and Excel exportproposed

    Exports that carry their caveat inside the document.

  • SHP exportproposed

    Shapefile export of case polygons.

    Absent by design. Demonstration polygons in a client GIS lose the on-screen caveat. When built: disabled by default, and a watermark attribute on every feature.

Case & Evidence Workspace

proposed

One case, its polygon, its imagery, its evidence log and its uncertainty note.

  • Case evidence viewproposed

    Before and after imagery, polygon, source and date, boundary basis, evidence log.

    Blocked on an imagery tile source with an acquisition-date record per scene. No stand-in pictures are rendered.

  • Field media and permit recordproposed

    Field photographs and the permit they evidence, held against the case.

    No media store and no permit record exist in this build.

  • Evidence log and uncertainty noteproposed

    What was checked, when, by whom, and what remains uncertain.

Supplier & Corporate Attribution

current

From the polygon to the concession, the estate or mill, the supplier, and the corporate group behind it.

  • One page per group: entities, mills, liability, disclosure.

  • Who controls the entity behind the licence, to the beneficial owner.

  • Attribution graph, concession to buyerproposed

    Concession to mill to supplier to group to buyer, marked direct, indirect or disputed.

  • Ownership historyproposed

    Who held the entity when the clearing happened, not only who holds it now.

  • Disputed-linkage handlingproposed

    A linkage the supplier disputes stays visible and stays disputed.

  • M1 · 09Policy analysisplanned

    Policy text read against the gap-check regulations.

    Not in the brief's eight. Open question: folds into Assess, or moves to another product. To be settled at the joint methodology session.

Client Workspace

current

The client's own scope: their supply base, their areas of interest, their saved work.

  • If we stop buying from this mill, which mills could take its place, on what evidence.

    SWAP answers a sourcing question inside the client's own supply base, so it sits here.

  • General view / our supply chain onlyproposed

    Toggle between the whole landscape and the client's own supply base.

  • AOI upload and drawproposed

    Bring or draw an area of interest and run the same analysis inside it.

  • Client spatial layersproposed

    Client-held boundaries rendered beside ours, kept separate from ours.

  • Saved analysisproposed

    A view, its filters and its edition, saved and reopenable.

04 · 04

Monitoring & Risk Intelligence, the current edition

Bi-weekly cadence · 2026-07-19 to 2026-08-01 · ED-2026-08-01

In this edition
52

Cases passing both gates: ≥ 2 ha and confidence Medium or High.

Below the threshold
0

Detections under 2 ha. Not a failure: they go on the list to monitor. Monitored-only register

Below the gate
0

Detections at Low confidence, held back as raw input. Monitored-only register

The edition count is never the total: 52 detections sit behind it in this cut-off, and 0 of them are held outside the edition.

Export formats
FormatStatusRule
Search and filter in-appcurrentEvery table on the sub-product screens filters in place.
PDFproposedCarries its caveat inside the document.
ExcelproposedCarries its caveat inside the document.
SHPproposedDisabled by default when built, and a watermark attribute on every feature: demonstration polygons in a client GIS lose the on-screen caveat.
05 · 05

Collaboration, a queue and a thread

Who owes a response, and where a comment can be left

Partner review queue

Open cases grouped by the entity they attach to, oldest first. Age is counted in editions against 2026-08-01.

EntityOpen casesStatusesOldest receivedAge (editions)
Rimba Makmur Group2Engagement, Monitoring2019-02-13194
Bintang Palma Group2Monitoring, Under review2019-02-19194
Teluk Emas Group6Monitoring, Open2019-03-23192
Bumi Hijau Group3Monitoring, Engagement2019-03-15192
Sawit Lestari Group6Monitoring, Under review2019-04-06191
Mahkota Sawit Group3Engagement, Monitoring2019-06-11186
Karya Palma Group4Open, Under review2019-07-26183
Gading Kencana Group3Monitoring, Under review2019-08-25180
Selat Mas Group4Monitoring, Engagement, Open2020-02-10168
Nusantara Agri Group4Open, Under review, Monitoring2021-02-13142
Cahaya Borneo Group5Under review, Monitoring, Engagement2021-09-26126
Harum Nusa Group4Open, Engagement, Monitoring2021-09-22126
Sinar Rimba Group2Open, Engagement2022-04-23111
Panca Agro Group2Open, Monitoring2023-09-1974
Puri Agro Group3Monitoring2025-08-0625
Comment threads

There is no comments dataset and no notification service behind this. A thread you write lives in this browser session only: it is not stored, not sent, and nobody else can see it.

Notification is proposed. What would drive it is a status change on a watched entity, a grievance moving to Closed or Dropped, or a new case attributed to a group on the watchlist.

Rimba Makmur Groupno thread in this session
Bintang Palma Groupno thread in this session
Teluk Emas Groupno thread in this session
Bumi Hijau Groupno thread in this session
Sawit Lestari Groupno thread in this session
06 · 06

Integration, read from the join graph

The join graph is the integration contract; the API itself stays proposed

5 inbound and 8 outbound integrations are tracked. The source-level detail returns when the live database is wired up.

Sub-products

M1 · 01Supplier group deforestation monitoringWhich supplier groups and which mills cleared what, on what evidence, and where.Deliverable · Case register, group and mill liability rankings, evidence blocks
M1 · 05HCV / HCS monitoringWhich conservation set-asides are disturbed, by whom, when, and on what evidence.Deliverable · Set-aside disturbance brief: status ladder, feature dossiers, group ranking
M1 · 04Smallholder and outgrower monitoringGSM plots by type and evidence strength.Deliverable · Plot register by village and type
M1 · 11Fire and burn-scar watchLand that burned and what happened next, with no claim about who lit it.Deliverable · Burn-scar register with the burn-to-planting sequence and concession intersection
M1 · 06High-risk landscape identification & monitoringin-page viewVillage and district risk classes with intervention focus.Deliverable · Ranked landscape work list
Bi-weekly edition reportin-page viewCases reported this edition, and what moved since the last one.
PDF and Excel exportin-page viewExports that carry their caveat inside the document.
SHP exportin-page viewShapefile export of case polygons.
Case evidence viewin-page viewBefore and after imagery, polygon, source and date, boundary basis, evidence log.
Field media and permit recordin-page viewField photographs and the permit they evidence, held against the case.
Evidence log and uncertainty notein-page viewWhat was checked, when, by whom, and what remains uncertain.
M1 · 07Supplier group profilingin-page viewOne page per group: entities, mills, liability, disclosure.Deliverable · Group profile sheet
M1 · 08Ownership mapping (UBO)Who controls the entity behind the licence, to the beneficial owner.Deliverable · Ownership chain with the evidence behind each link
Attribution graph, concession to buyerin-page viewConcession to mill to supplier to group to buyer, marked direct, indirect or disputed.
Ownership historyin-page viewWho held the entity when the clearing happened, not only who holds it now.
Disputed-linkage handlingin-page viewA linkage the supplier disputes stays visible and stays disputed.
M1 · 09Policy analysisPolicy text read against the gap-check regulations.Deliverable · Policy gap memo
M1 · 02SWAP, supplier withdrawal and alternative provisionIf we stop buying from this mill, which mills could take its place, on what evidence.Deliverable · Scored candidate shortlist per target mill, exclusions and coverage
General view / our supply chain onlyin-page viewToggle between the whole landscape and the client's own supply base.
AOI upload and drawin-page viewBring or draw an area of interest and run the same analysis inside it.
Client spatial layersin-page viewClient-held boundaries rendered beside ours, kept separate from ours.
Saved analysisin-page viewA view, its filters and its edition, saved and reopenable.
M1 · 03NDPE grower supportPolicy commitment against measured performance, grower by grower.Deliverable · Support priority list with the evidence behind it
M1 · 10Helpdesk platformanalyst servicein-page viewAnalyst desk on top of the same register, case triage and response.Deliverable · Ticketed analyst response, SLA tracked
Engagement timelinein-page viewReport, clarification, response, corrective action, closure or reopen, on one line per case.
Comment and evidence uploadin-page viewComment on an alert and attach evidence, on the grower support page.
Notificationin-page viewTell the right person when a case moves, rather than waiting to be read.
Partner review queuein-page viewA partner's queue of cases awaiting their review.
Corporate Database contractin-page viewEntity, ownership and group identity, read from one master.
Traceability contractin-page viewMill, supplier and plantation linkage, read from the traceability spine.
Grievance contractin-page viewCase status and source, exchanged with the grievance register.
Reporting and client-system contractin-page viewEditions and cases delivered into the client's own systems.
Fire and burn-scar watch